Free Tool

Check a Painting Estimate Before You Sign

Three separate checks, kept separate on purpose: what Oregon and Washington law require of the paperwork, what a good painting scope names, and where the total sits against the published ranges.
Not legal advice. Each legal item links the provision it reports.

Check the scope

Tick each item the estimate actually names. Nothing you enter leaves this page.

9 of 9 items not named yet. Worth asking the painter to add before you compare or sign:

  • Prep steps, and which surfaces get them
  • Primer: spot or full, and which primer on which surface
  • The paint brand and product line
  • Number of coats, and whether the second is a full coat
  • Colors and sheens for body, trim, doors and accents
  • Repairs included, and the price for anything found later
  • Start date, length, and how weather days are handled
  • Warranty: how long, and what it covers
  • Payment schedule and deposit as a share of the total

Place the total (optional)

Published range for this job: $5,500 to $10,000

How to read the result

The scope list is editorial: it is the list the cost guide gives for what a written estimate should include. The price check compares a real number with an editorial range, so its honest output is a question to ask, never a verdict. The legal items below are the only layer that is checkable at the source, and each one links it.

Before any of it, look the license up: how to check a painter's license in Oregon and Washington.

What the contract has to contain

Oregon (Portland metro)

  1. 1. A written contract once the price passes $2,000

    ORS 701.305(1)

    A contractor may not perform work to construct, improve or repair a residential structure for a property owner without a written contract if the aggregate contract price exceeds $2,000. If a contract started under $2,000 and grows past it, the contractor has five days from when they knew or reasonably should have known to deliver a written one.

    What to look for: Nearly every exterior repaint and most whole-interior jobs in the cost guide clear $2,000, so a verbal price or a one-line emailed figure is below what the statute contemplates for the job.

    Limit: The statute also says failing to have a written contract does not void the contract. A missing contract is a licensing problem for the contractor, not a way out of the deal.

  2. 2. What the contract must contain

    OAR 812-012-0110(1)

    Where ORS 701.305 requires a written contract, the contract or an addendum must contain the contractor’s name, address, phone number and CCB license number as shown on board records; acknowledgement of a written warranty offer where ORS 701.320 requires one; a conspicuous explanation of the owner’s rights, including the ability to file a complaint with the board and any mediation or arbitration provision; the customer’s name and address; the address where the work is done; a description of the work; and price and payment terms.

    What to look for: The CCB license number is the item most worth checking first: it must match board records. On a painting job, "description of the work" is where the surfaces, prep, product and coats belong.

  3. 3. Three notices, delivered no later than signing

    OAR 812-012-0130; ORS 87.093(2)

    A contractor required to have a written contract must deliver the Consumer Protection Notice, the Notice of Procedure, and the Information Notice to Owner About Construction Liens on or before the date the contract is entered into, and keep proof of delivery.

    What to look for: These are CCB-issued forms. They may be contained in the contract itself, but they should be identifiable as the forms.

  4. 4. No lien notice, no lien

    ORS 87.093(2), (4), (6)

    Where the aggregate price exceeds $2,000, the original contractor must deliver the Information Notice to Owner About Construction Liens when a residential construction or improvement contract is signed. A contractor who fails to deliver it may not claim a construction lien on the property under that contract.

    What to look for: Keep a dated copy of what you were handed. This is the notice with the largest practical consequence on the list.

    Limit: It removes the original contractor’s own lien right under that contract. Subcontractors and suppliers have separate lien rights with their own notice rules.

  5. 5. Cancellation until midnight the next business day

    ORS 701.310

    An owner who enters into an initial written contract for work on a residential structure they own may cancel it by delivering written notice before 12 midnight at the end of the next business day. The notice can be in any written form, including email.

    What to look for: Agreeing to an immediate start is one of the things that removes the right, so it is worth knowing before a crew shows up the next morning.

    Limit: It does not apply if both parties agreed work would begin before the cancellation period ended, after the contractor has substantially begun the work, or to a modification made after the period has run.

  6. 6. The right to complain to the CCB cannot be contracted away

    ORS 701.315

    A contract for work on a residential structure may not contain a provision limiting a person’s right to file a complaint with the Construction Contractors Board. The same section permits a contract to require mediation or arbitration of disputes.

    What to look for: An arbitration clause is a normal, lawful term. A clause waiving board complaints is not enforceable under this section.

  7. 7. Deposits over half the price carry a specific consequence

    ORS 701.312

    Where a contractor accepts a deposit of more than 50 percent of the total price for a home improvement and then fails to perform diligently and to the contract specifications, or fails to perform and does not return the deposit within 10 days of a reasonable demand, the CCB may place the contractor on probation.

    What to look for: The statute does not cap deposits. It attaches a board consequence to large ones that go wrong, which is narrower than a limit.

Washington (Vancouver and Clark County)

  1. 1. The NOTICE TO CUSTOMER disclosure, before work starts

    RCW 18.27.114(1)-(3)

    A contractor agreeing to repair, alter or construct four or fewer residential units must give the customer the statutory NOTICE TO CUSTOMER disclosure before starting work once the bid or contract price totals $1,000 or more. It states the registration number and the bond or deposit, and that the bond may not be enough to cover a claim. The contractor must keep the signed copy for at least three years, and must tell the customer if its registration expires or is suspended or revoked before the work is finished.

    What to look for: The form itself warns that the bond is not for your exclusive use and covers all of that contractor’s work. RCW 18.27.040 sets the bond at $30,000 for a general contractor and $15,000 for a specialty contractor, shared across every claimant.

  2. 2. No disclosure, no lien claim

    RCW 18.27.114(4)

    A contractor subject to the disclosure requirement may not bring or maintain a lien claim based on the contract without proving the customer received the disclosure statement.

    What to look for: As in Oregon, a dated copy of what you were handed is what makes this provision usable.

  3. 3. Oregon’s written-contract and cancellation rules do not apply here

    No RCW 18.27 equivalent of ORS 701.305 or ORS 701.310

    Washington’s contractor registration chapter imposes the disclosure above. It has no equivalent of Oregon’s $2,000 written-contract mandate, its prescribed contract terms, or its next-business-day cancellation right.

    What to look for: A Portland homeowner and a Vancouver homeowner buying the same paint job do not hold the same protections. Ask for a written scope in Washington because it is worth having.

    Limit: This describes RCW chapter 18.27 only. Other Washington law, and the contract itself, can create rights this chapter does not.

Sources for the legal checklist

  1. ORS Chapter 701: Construction Contractors and Contracts (Oregon Legislative Assembly, Oregon Revised Statutes, 2025 edition as published online)

    ORS 701.305, the written contract required once the aggregate price exceeds $2,000; ORS 701.310, the right to cancel an initial written contract until midnight at the end of the next business day; ORS 701.312, the deposit-over-50-percent probation ground; and ORS 701.315, which bars a contract from limiting the right to file a CCB complaint. Also ORS 701.021(1), under which a person that undertakes, offers to undertake or submits a bid to do work as a contractor must hold a current CCB license and an appropriate endorsement, and ORS 701.005(5)(a), whose definition of contractor covers work to construct, alter, repair or improve a structure attached to real estate, or any part of that work.

    Note: The Oregon Revised Statutes are republished after each legislative session and section text can change. Check the section itself rather than relying on a quotation of it.

    Checked 2026-10-08.

  2. OAR 812-012-0110: Terms of Written Contract (Oregon Secretary of State, Oregon Administrative Rules)

    The items a written residential construction contract must contain, including the contractor’s name, address, phone and CCB license number, an explanation of the owner’s rights, the work address, a description of the work, and price and payment terms.

    Checked 2026-10-08.

  3. OAR 812-012-0130: Delivery and Proof of Delivery of Consumer Notice (Oregon Secretary of State, Oregon Administrative Rules)

    That a contractor required to have a written contract must deliver the Consumer Protection Notice, the Notice of Procedure, and the Information Notice to Owner About Construction Liens on or before the date the contract is entered into.

    Checked 2026-10-08.

  4. ORS Chapter 87: Statutory Liens (Oregon Legislative Assembly, Oregon Revised Statutes, 2025 edition as published online)

    ORS 87.093: the original contractor must deliver the Information Notice to Owner About Construction Liens when a residential contract is signed, and a contractor who fails to deliver it may not claim a construction lien under that contract.

    Note: Same republication caveat as ORS chapter 701.

    Checked 2026-10-08.

  5. CCB Residential Construction Contract Checklist (Oregon Construction Contractors Board). Explanatory, not the governing text.

    The CCB’s own plain-language restatement of the contract requirements. Useful as something to hand a contractor; the governing text is ORS 701.305 and OAR 812-012-0110.

    Note: A compliance aid published by the board, not the rule itself. Where they differ, the rule governs.

    Checked 2026-10-08.

  6. RCW 18.27.114: Disclosure statement required; prerequisite to lien claim (Washington State Legislature)

    What applies in Vancouver and Clark County instead: a contractor working on four or fewer residential units must give the customer the NOTICE TO CUSTOMER disclosure before starting work once the price totals $1,000 or more, and cannot maintain a lien claim without proof it was received.

    Note: Washington sets no equivalent of Oregon’s $2,000 written-contract requirement or its next-business-day cancellation right.

    Checked 2026-10-08.

  7. RCW 18.27.040: Bond or other security required (Washington State Legislature)

    The Washington contractor bond amounts: $30,000 for a general contractor and $15,000 for a specialty contractor, with contractors registered as of June 30, 2024 treated as compliant until their next renewal.

    Checked 2026-10-08.

  8. CCB License Search (Oregon Construction Contractors Board)

    The official register of Oregon contractor licenses: status, endorsements, bond and insurance on file, and complaint history.

    Checked 2026-08-20.

  9. Verify a Contractor, Tradesperson or Business (Washington State Department of Labor & Industries)

    The official Washington register for work in Vancouver and Clark County: registration status, bond, and lawsuits filed against the bond.

    Checked 2026-08-20.

Bid checker FAQs

Does a painting contract have to be in writing in Oregon?

Under ORS 701.305, a contractor may not perform residential work without a written contract once the aggregate price exceeds $2,000. OAR 812-012-0110 lists what that contract must contain, including the contractor’s CCB license number and a description of the work.

Can I cancel a painting contract after I sign it?

ORS 701.310 lets an Oregon owner cancel an initial written contract by written notice before midnight at the end of the next business day. The right does not apply if both sides agreed work would begin sooner, or once the contractor has substantially begun. Washington’s contractor chapter has no equivalent.

Is this legal advice?

No. The page reports what named provisions say and links each one at the source. For a question about your own contract, ask the CCB, Washington L&I, or a lawyer.

Related Reading

Turn a Range Into an Estimate

The ranges here are a starting point. A free on-site estimate prices your walls, your prep and your access.